Çѱ¹°ÇÃà½Ã°øÇÐȸ|³í¹®Áý 2021³â 12¿ù

³í¹®¸í È­¼º¼º¿ªÀÇ±Ë ºÐ¼®À» ÅëÇÑ Á¶¼±½Ã´ë ÆÈ´Þ¹® °Ç¼³ ¼Ò¿äÀÚ¿øÀÇ Çö´ëÀû ÇØ¼® / A Modern Interpretation of the Resources Required for the Construction of Paldal-mun in the Joseon Dynasty through the Analysis of HwaSungSungYouk-EuGye
ÀúÀÚ¸í ±è±ÕÅÂ
¹ßÇà»ç Çѱ¹°ÇÃà½Ã°øÇÐȸ
¼ö·Ï»çÇ× Çѱ¹°ÇÃà½Ã°øÇÐȸ ³í¹®Áý, Vol.21 No.6 (2021-12)
ÆäÀÌÁö ½ÃÀÛÆäÀÌÁö(641) ÃÑÆäÀÌÁö(12)
ISSN 15982033
ÁÖÁ¦ºÐ·ù ½Ã°ø(Àû»ê)
ÁÖÁ¦¾î È­¼º¼º¿ªÀDZË; ÆÈ´Þ¹®; °ø»ç±â°£; ºñ¿ë; ÀηÂÀÚ¿ø ; hwasungsungyouk-eugye; paldal-mun; time; cost; human resource
¿ä¾à1 È­¼º¼º¿ªÀDZ˿¡´Â È­¼º¼º¿ª¿¡ ´ëÇÑ »ó¼¼Á¤º¸°¡ ±â·ÏµÇ¾î ÀÖÀ¸³ª, Çö´ëÀû °Ç¼³°ü¸® °üÁ¡¿¡¼­ ºÐ¼®°ú Æò°¡´Â Á¦ÇÑÀûÀ¸·ÎÁøÇàµÇ¾ú´Ù. ÀÌ¿¡ º» ¿¬±¸¿¡¼­´Â ÆÈ´Þ¹®À» ´ë»óÀ¸·Î ÇÏ¿© ½Ã°£, ºñ¿ë, Àη µî °Ç¼³°ü¸® °ü·Ã Á¤º¸¸¦ ºÐ¼®ÇÏ¿´´Ù. ÆÈ´Þ¹® °Ç¼³¿¡ ÁÖ¿ä°øÁ¾Àº ±âÃʰø»ç¿Í ¼®°ø»ç¿´°í, Àüü °ø±â´Â 6°³¿ù·Î ÀüüÀûÀ¸·Î ¸Å¿ì ºü¸£°Ô °ø»ç°¡ ÁøÇàµÇ¾ú´Ù. ÆÈ´Þ¹® °Ç¼³ÀǼҿäºñ¿ëÀÇ ÃÑÇÕÀº ¾à 52,423³ÉÀε¥, ÀÚÀçºñ¿¡ ¾à 15,9332³ÉÀÌ ¼Ò¿äµÇ°í, ÀΰǺñ¿¡´Â ¾à 36,4901³ÉÀÌ ¼Ò¿äµÇ¾ú´Ù. À̸¦ ÇöÀç°¡Ä¡·Î ȯ»êÇϸé, ÀÚÀçºñ ¾à 11¾ï¿ø, ÀΰǺñ ¾à 25¾ï¿øÀ¸·Î ÇÕÀº ¾à 36¾ï¿ø ¼öÁØÀÌ´Ù. ÇâÈÄ¿¡ °øÁ¾º° ÀÛ¾÷ ±â°£°ú ¿¬°èµÈ»ó¼¼ ÅõÀÔÀη µµÃâ µî Ãß°¡ÀûÀÎ ¿¬±¸¸¦ ÁøÇàÇÒ ¿¹Á¤ÀÌ´Ù.
¿ä¾à2 Although detailed information on the construction of Hwasung was recorded in the Hwasungsungyoukeugye,analysis and evaluation from the perspective of modern construction management werelimited. Therefore, in this study, construction management related information such as time, cost, andmanpower was analyzed for Paldal-mun. The main work involved in the construction of Paldal-munwas foundation work and masonry work, and the total construction period was 6 months, with theoverall construction progressing very quickly. The total cost of the construction of Paldal-mun wasabout 52,423 Nyong, which can be divided into about 15,9332 Nyang for materials and 36,4901 Nyangfor labor cost. Converting these to present value, the material cost is about 1.1 billion won and the laborcost is about 2.5 billion won, and the sum of these is about 3.6 billion won. In the future, we plan toconduct additional research in this area such as deriving detailed input manpower related to the workperiod for each type of work.
¼ÒÀåó Çѱ¹°ÇÃà½Ã°øÇÐȸ
¾ð¾î Çѱ¹¾î
DOI https://doi.org/10.5345/JKIBC.2021.21.6.641