³í¹®¸í |
½Ç½Ã¼³°è´Ü°è BIM ±â¹Ý µµ¸é ÀÛ¾÷ È¿À² Çâ»óÀ» À§ÇÑ µµ¸éÈ ÅÛÇø´ °³¹ß / Developing a Drawing Template for BIM software to Improve BIMbased Drawing Work Efficiency in the Construction Document Phase |
¼ö·Ï»çÇ× |
Çѱ¹BIMÇÐȸ ³í¹®Áý, Vol.10 No.4 (2020-12) |
ÆäÀÌÁö |
½ÃÀÛÆäÀÌÁö(98) ÃÑÆäÀÌÁö(12) |
ÁÖÁ¦¾î |
½Ç½Ã¼³°è´Ü°è; BIM; BIM ±â¹Ý µµ¸é; ÅÛÇø´ ; Construction documents phase; BIM(Building information modeling); BIM-based Drawing; Template |
¿ä¾à2 |
Based on the prior research which developed the consistency review checklist of the BIM model and 2D drawing through the drawing analysis of the construction documents phase, the apparent limits of the existing template and the template development items were derived. As well, the BIM-based drawing templates of the construction documentation phase were developed and verified using ArchiCAD BIM software. The developed template was then applied to the actual project model in the construction documents phase, and, as a result, 50% of existing work elements could be utilized as templates. This is an increase of more than 30% over the existing template utilization elements, and it is analyzed to be effective in practical application and utilization. Based on the results of this study, if the BIM model construction criteria matching the drawing's utilization purpose are presented, while at the same time the BIM data interlocking and drawing template development studies are conducted, the utilization of BIM data can be maximized and additional drawing work can be minimized to increase the percentage of template utilization elements. In addition, it is believed that this can employed to address functional and institutional problems of BIM-based drawing and make a contribution to the activation of BIM. |