³í¹®¸í |
½Ã°ø´Ü°è BIM Àû¿ë¿¡ ÀÇÇÑ Àç½Ã°ø ¹æÁö È¿°úºÐ¼® / Analysis of BIM Impact on Preventing Rework in Construction Phase |
¼ö·Ï»çÇ× |
Çѱ¹°ÇÃà½Ã°øÇÐȸ ³í¹®Áý, Vol.18 No.2 (2018-04) |
ÆäÀÌÁö |
½ÃÀÛÆäÀÌÁö(169) ÃÑÆäÀÌÁö(8) |
ÁÖÁ¦¾î |
°ÇÃàÁ¤º¸¸ðµ¨ ; ÅõÀÚÀÚº»¼öÀÍ·ü ; ÀÚ·á¿äû¼ ; Àç½Ã°ø ; building information modeling(BIM) ; return on investment(ROI) ; request for information(RFI) ; rework |
¿ä¾à1 |
º» ¿¬±¸´Â ½Ã°ø´Ü°è¿¡ Àû¿ëµÈ BIMÀÌ Àç½Ã°ø ¹æÁö¿¡ ±â¿©ÇÑ È¿°ú¸¦ ºÐ¼®ÇÏ´Â °ÍÀ» ¸ñÀûÀ¸·Î ÇÏ¿´´Ù. ±âÁ¸ ¿¬±¸¿¡¼´Â ´Ù¾çÇÑ ¹æ¹ýÀ¸·Î BIM¿¡ ´ëÇÑ Àû¿ëÈ¿°ú¸¦ Á¦½ÃÇÏ°í ÀÖÀ¸³ª º¸´Ù Çö½ÇÀûÀÌ°í ½Å·Ú¼º ÀÖ´Â ºÐ¼® ¹æ¹ý·ÐÀÌ ¿ä±¸µÇ°í ÀÖ´Ù. ÀÌ¿¡ º» ¿¬±¸¿¡¼´Â ÇöÀå ½Ç¹«ÀÚ¸¦ ´ë»óÀ¸·Î BIM È¿°úºÐ¼®¿¡ ´ëÇÑ ¿ä±¸»çÇ×À» ¼öÁýÇÏ°í, À̸¦ ¹Ý¿µÇÑ BIM È¿°úºÐ¼® ¹æ¹ý·ÐÀ» Á¦½ÃÇÏ¿´´Ù. »ç·Ê ¿¬±¸¸¦ ÅëÇØ Á¦½ÃÇÑ ¹æ¹ý·ÐÀ» ±â¹ÝÀ¸·Î Àç½Ã°ø ¹æÁö È¿°ú¸¦ ºÐ¼®ÇÏ¿´´Ù. »ç·ÊÇöÀå¿¡¼´Â BIM Àû¿ëÀ» ÅëÇØ ¾à 370,519,593¿øÀÇ Àç½Ã°ø ¹æÁö È¿°ú°¡ ÀÖ´Â °ÍÀ¸·Î ºÐ¼®µÇ¾ú´Ù. ¶ÇÇÑ ÇöÀå ½Ç¹«ÁøÀ» ´ë»óÀ¸·Î º» ¿¬±¸¿¡¼ Á¦½ÃÇÑ ¹æ¹ý·Ð ¹× È¿°úºÐ¼® °á°ú¿¡ ´ëÇÑ ÀûÇÕ¼ºÀ» ÀÚ¹®ÇÏ¿´À¸¸ç ÃæºÐÇÑ ½Å·Ú¼ºÀÌ ÀÖ´Â °á°úÀÎ °ÍÀ¸·Î È®ÀÎÇÏ¿´´Ù. º» ¿¬±¸ÀÇ °á°ú¹°Àº ÇâÈÄ BIM ¼º°úÃøÁ¤ ¿¬±¸¿¡ È¿À²ÀûÀÎ ±âÃÊÀÚ·á·Î È°¿ëµÉ ¼ö ÀÖÀ» °ÍÀÌ´Ù. |
¿ä¾à2 |
The purpose of this study is to analyze the effects of applying BIM to the construction phase on preventing rework. Previous studies have presented the contribution of BIM in various ways, but a more practical and reliable analysis methodology are required. In this study, a BIM effect analysis methodology was proposed after collecting requirements on BIM effect analysis from field professionals. In the case study, the rework prevention effect was analyzed based on the proposed methodology. As a result, it was found that BIM application produced the rework prevention effect of approximately KRW 370,519,593. In addition, a consultation with field professionals on the suitability of the proposed methodology and effect analysis results were revealed that the results were sufficiently reliable. The results of this study can be used as efficient basic materials for research on BIM performance measurement in the future. |