| ³í¹®¸í |
±¹³» PV ¹× BIPV ½Ã½ºÅÛÀÇ ¸ð´ÏÅ͸µ ½ÇÅÂ¿Í ¹ßÀü·® ºÐ¼® / A Field Survey on the Monitoring System Status and Annual Yield of PV and BIPV System in Korea / ¼¼¼Ç¥´ |
| ¼ö·Ï»çÇ× |
Çѱ¹»ýÅÂȯ°æ°ÇÃàÇÐȸ Çмú¹ßÇ¥´ëȸ ³í¹®Áý, Åë±Ç27È£(v.14 n.2) (2014-11) |
| ÆäÀÌÁö |
½ÃÀÛÆäÀÌÁö(70) ÃÑÆäÀÌÁö(2) |
| ÁÖÁ¦¾î |
ž籤 ¹ßÀü ½Ã½ºÅÛ ; ¸ð´ÏÅ͸µ ½Ã½ºÅÛ ; ½ÇÅÂÁ¶»ç ; PV System ; Monitoring System ; Field Survey |
| ¿ä¾à2 |
In this study, a field survey of monitoring system and performance analysis of PV/BIPV system in Korea was conducted.Regarding the monitoring system, analysis result shows that monitoring result for performance analysis was not available in22% of the surveyed sites. In the case of annual power yield analysis, PV system for power plant shows the highest value of1,230.2 kWh/kWp¡¤yr. BAPV of 1,141.9 kWh/kWp¡¤yr follows power plant and BIPV shows the lowest value of 690.9 kWh/kWp¡¤yr. BIPV In caseof regional performance analysis, Deagu¡¤Gyeongsang region shows the highest performance. As the BIPV system is generallyaffected by a self-shading, poor installation condition and temperature, huge variation range of 329.6 to 1087.4 kWh/kWp¡¤yr shows. |