논문명 Development of a Flash-based Schedule Management Tool for Smart Devices
저자명 Jang, Myunghoun
발행사 한국건축시공학회
수록사항 한국건축시공학회 논문집, v.12 n.6 (2012-12)
페이지 시작페이지(558) 총페이지(8)
ISSN 15982033
주제분류 시공(적산)
주제어 ; schedule management ; smart device ; bar chart ; schedule network
요약2 Schedule management of construction work is critical to completing construction projects within a given period of time. Many efforts have been made and multiple tools have been developed to support the management of construction projects using smart devices such as smartphones and tablet PCs. This study proposed a method for managing construction schedules via a smart device using Flash. The interactive and graphic properties of Flash enable the development of an app that can allow a field manager to manage schedules easily and efficiently. A prototype was implemented using Adobe Flex Builder, and a sample network was applied in a smartphone. It is convenient for a construction manager to manage construction schedules using the tool because Flash controls graphic components easily. In further studies, network diagrams such as CPM (Critical Path Method) should be developed and applied to the app.
소장처 한국건축시공학회
언어 영어
분석서지
건설관리 > 건설정보화

시공 작업의 일정관리는 주어진 공기 내에 사업을 완료하기 위해 중요하다. 스마트폰과 태블릿 PC와 같이 스마트 기기를 활용하여 건설사업 관리를 지원하기 위해 여러 노력이 있었고, 다수의 도구가 개발되었다. 이 연구에서는 건설 일정을 플래시를 사용하는 스마트 기기를 통해 관리하는 방법을 제안하였다. 플래시의 대화형이면서 시각적인 속성은 현장 관리자가 일정을 보다 쉽고 효율적으로 관리하도록 해주는 애플리케이션 개발을 가능하게 한다. Adobe Flex Builder를 활용하여 프로토타입을 시행하고, 스마트폰에 샘플 네트워크를 적용하였다. 플래시가 시각적 요소들을 용이하게 다루게 해줌에 따라 관리자가 도구를 사용하여 일정을 편리하게 관리할 수 있었다. 향후 CPM과 같은 네트워크 다이어그램이 개발되어 애플리케이션으로 적용되어야 할 것이다.