| 논문명 |
현장 Mock-up의 BIM 기반 시뮬레이션 기법 적용성 분석 연구 / Feasibility Study of Application BIM Simulation System to Mock-up Site |
| 저자명 |
장세준 (Jang Se-Jun ) ; 윤석헌 (Yun Seok-Heon) ; 윤준선(Yun Jun-Seon) ; 백준홍 (Peak Joon-Hong) |
| 수록사항 |
대한건축학회논문집 구조계, v.23 n.10 (2007-10) |
| 주제어 |
건축정보모델링 ; 4차원 CAD ; 간섭관리시스템 ; 시공성 분석 ; BIM ; 4D ; Mock-up ; 3D |
| 요약1 |
본 연구에서는 BIM 모델을 이용하여 Mock-up 현장을 시뮬레이션화하였으며, 설계도면의 시공성을 사전에 검토해보고, 이를 현장제작 Mock-up과 비교?분석하여 효율적인 공사 관리시스템을 제시하고자 한다. |
| 요약2 |
Construction project is completed through several stages and problems of each stage affect directly not only now but also next. Defect of 2D drawings influence in construction phase, and it make many loss on project. Nowadays we practically use real Mock-up test in construction sites to solve the problems. But it also has many problems which are waste much money and time. Therefore, this study tries to analyze effect that is occurred by appling BIM Mock-up simulation instead of real Mock-up execution. These analysis is conducted by comparing two construction building site. These have same shape but one is made for BIM Mock-up, and another is real Mock-up. Comparison points of view are cost, time and operator‘s satisfaction. It is expect that BIM Mock-up is more effective at low cost and on shorter time. |