| ³í¹®¸í |
°Ç¹° ³Ã¿¿ø¼³ºñ½Ã½ºÅÛÀÇ ¿¡³ÊÁöÀý¾à ¼³°èÁ¶°Ç Æò°¡ / Evaluation for the Energy Conservation Design Requirement of Building Chilling System |
| ¼ö·Ï»çÇ× |
´ëÇѰÇÃàÇÐȸ³í¹®Áý °èȹ°è, v.14 n.10 (1998-10) |
| ÆäÀÌÁö |
½ÃÀÛÆäÀÌÁö(219) ÃÑÆäÀÌÁö(10) |
| ¿ä¾à1 |
°Ç¹° ¼³ºñ½Ã½ºÅÛÀÇ ¼³°è¿¡ À־ ½Ã½ºÅÛÀÇ ¿¡³ÊÁöÀý¾à¼º, °æÁ¦¼º, ȯ°æ ¼ºµîÀÇ °üÁ¡¿¡¼ °Ç¹°ÀÇ ºÎÇϳª ½Ã½ºÅÛÀÇ Æ¯¼º¿¡ °üÇÑ °¢Á¾ ¿ä¼Ò¸¦ °í·ÁÇÒ Çʿ䰡 ÀÖ´Ù. ¿¹¸¦µé¾î, ¿¿ø¼³ºñ½Ã½ºÅÛÀÇ ¿¡³ÊÁöÀý¾à¼ºÀ» »ý°¢ÇÏ¿´À» °æ¿ì ÀϹÝÀûÀÎ ¼³°è°úÁ¤¿¡ À־ ´ë»ó°Ç¹°ÀÇ ¿ºÎÇϰè»ê, ¿¿ø¹æ½Ä, ±âÁ¾, ºÎ ÇÏÁý°è ¹× ¾ÈÀüÀ²¿¡ ±âÃÊÇÑ ±â±â¿ë·®, ±â±â´ë¼öºÐÇÒ µîÀÇ ¿ä¼Ò°¡ °í·ÁµÈ´Ù. ½Ã½ºÅÛÀÇ ¼³°èǰÁú¸é¿¡¼ »ý°¢Çغ¸¸é ½Ã½ºÅÛ¼³°èÀÇ Ãʱâ´Ü°è¿¡¼ ¼³°è»óÀÇ °¢Á¾ ¿ä¼Ò°¡ ½Ã½ºÅÛÀÇ ¸ñÀûƯ¼ºÄ¡¿¡ ¹ÌÄ¡´Â ¿µÇâÀ» Á¤·®ÀûÀ¸·Î ÆÄ¾ÇÇÏ¿© ¼³°è¿¡ ¹Ý¿µÇÏ´Â °ÍÀº ½Ã½ºÅÛÀÇ ¼³°èÁ¤µµ¸¦ Çâ»ó½ÃŰ´Â µ¥ ±â¿©ÇÏ°Ô µÇ¸ç °á°úÀûÀ¸·Î ¼³°èǰÁúÀ» Çâ»ó½ÃŰ°Ô µÇ¾î Áß¿äÇÏ´Ù°í ÆÇ´ÜµÈ´Ù. º» ¿¬±¸´Â °Ç¹° ¼³ºñ½Ã½ºÅÛÀÇ ¼³°èǰÁú Çâ»óÀ̶ó´Â °üÁ¡¿¡¼, ¿¿ø¼³ºñ½Ã ½ºÅÛÀ» ´ë»óÀ¸·Î ½Ã½ºÅÛÀÇ ¿¡³ÊÁöÀý¾à¼ºÀ» ¸ñÀûƯ¼ºÄ¡·Î ÇÏ¿´À» °æ¿ìÀÇ ¼³ °è¿ä¼ÒÀÇ ¼³°èÁ¤µµ¿¡ ´ëÇÑ ¿µÇâ¿¡ °üÇÏ¿© Á¤·®ÀûÀÎ °ËÅ並 ½Ç½ÃÇÏ´Â °ÍÀ» ¸ñÀûÀ¸·Î Çϰí ÀÖ´Ù. º» ³í¹®¿¡¼´Â ±× ±âÃÊÀûÀÎ °ËÅä·Î¼, ³Ã¿¿ø¼³ºñ½Ã½º ÅÛÀÇ ¼³°è¸¦ ´ë»óÀ¸·Î ´ÙÀÎÀÚ¿äÀνÇÇè ¹× ºÐ»êºÐ¼®¿¡ ¹ÙÅÁÀ» µÐ ÇØ¼®°á°ú ¿¡ ´ëÇÏ¿© ±â¼úÇϰí ÀÖ´Ù. |
| ¿ä¾à2 |
It becomes important to study or estimate the quality of engineering design of building equipment systems. This Paper reports the method of Quality estimation and a case study to or the of building chilling system for the first step. At first, fundamental surveys are conducted about components of building chilling system, their characteristics of load ratio vs efficiencies, energy demand in building, etc. Secondly 6 design parameters are selected for the quality estimation study on building chilling system. They are 2 load factors(mean and variance), 2 system factors(system type and full load characteristic), and 2 engineering factors(number of apparatus, excess ratio of capacity). Finally, the relations between SCOP (system s coefficient of performance) and design parameters are discussed and their contributions to SCOP are estimated by using multiple factorial analysis of parameter design method. |